What is multiplex?
On May 10, 2023, City Council adopted the Official Plan Amendment and Zoning By-law Amendment to permit multiplexes citywide.
The Multiplex study is one component of the City’s Expanding Housing Options in Neighborhoods (EHON) initiative. This study focused on permitting multiplexes – residential buildings containing up to four units, plus the garden suite in the backyard. As long as you have enough space, there are 5 units in total that are allowed to be built on one property.
Nestwood home 9 steps to develop a multiplex
1. Feasibility Study
-
To confirm the current zoning-bylaw of the land is allowed for multiplex
-
Estimate proposed building area
-
Estimate construction cost
2. Architectural Schematic Design
-
Number of units, bedroom, washroom required
-
Floor plans
-
Front facade rendering
3. Building Permit (ARCH/STRUC/HVAC)
-
Architectural building permit
-
Structure building permit
-
Mechanical building permit
4. Interior Design
-
Interior floor plan
-
Interior rendering
-
Interior furniture plan
-
Interior ceiling and lighting plan
-
Interior cabinetry detail
-
Interior elevation
-
Interior finish material selection
-
Appliances selection
5. Cost Estimate
-
We will provide an accurate construction cost estimate based on the client approved architectural and interior design drawings
6. Value Engineering
-
We will optimize the construction cost estimate by adjusting the architectural or interior design details to ensure it falls within the owner's expected range.
7. Tender
-
More than 100 quality-assured construction subcontractors of various types, with whom we have long-term cooperation, will be invited to bid based on the tender requirements.
8. Construction Management
-
We manage all the trades through a cloud-based scheduling tool that updates schedules in real-time to enhance booking efficiency, material delivery and trade coordination. The project schedule also comes as an accessible online calendar on our client portal.
9. Warranty
-
1 year - All items
-
2 years - All systems ( Insulation, Water barrier, HVAC, Plumbing, etc.)
-
7 years - Structure